Duncan Aviation logo
MENU
CJ3-ProLine-Fusion.jpg

CJ3 Pro Line Fusion Upgrade

Duncan Aviation and Rockwell Collins teamed up to bring Citation CJ3 operators a new aftermarket option for their flight deck that meets upcoming mandates and enhances their flying and ownership experience.

Duncan Aviation and Rockwell Collins have installed and certified the Pro Line Fusion flight deck for the CJ3.

The Solution

Rockwell Collins’ Pro Line Fusion has the following powerful baseline features:

  • ADS-B Out compliance including the latest DO 260B standard
  • Better landing minima with WAAS and LPV approaches
  • Radius to Fix (RF) legs to access efficient curved routes
  • Synthetic Vision System with terrain, obstacles and airport highlighting
  • High-resolution topographical maps
  • Touch-screen primary displays
  • Graphical flight planning
  • Memorized flight deck formats
  • Terminal charts and enhanced maps
  • Automatic display and sensor reversion

Key Options

  • Graphical weather (data link or XM)
  • IFIS (charts) on outboard AFD (dual)
  • Many more in work!

The Installation

Duncan Aviation is a leader in avionics installations and certifications. The company is an authorized dealer for most major cockpit and cabin avionics equipment, and has an in-house engineering team that regularly collaborates with OEMs for new STCs.

Duncan Aviation’s engineering team includes aircraft systems and structures engineers, as well as flight analysts, who have more than 30 years of experience providing approved design changes for interiors and airframe modifications, avionics system installations and system upgrades. Every day, the engineering team works with the Federal Aviation Administration (FAA) and civil aviation authorities in countries around the world to get validation or approval for the designs developed by the Duncan Aviation team.

Additionally, Duncan Aviation holds an Organization Designation Authorization (ODA) from the FAA for Supplemental Type Certificates (STC), Maintenance Repair Overhaul (MRO) and Parts Manufacturer Approval (PMA).

Other Work

As a full-service MRO facility, Duncan Aviation prides itself in the timely and efficient management of multi-shop projects. This allows operators to take full advantage of their aircraft’s downtime by adding other necessary and desired work to the project. In addition to the Fusion upgrade, operators may request additional work, including the following:

Request Quote Contacts
Watch "CJ3 Pro Line Fusion Upgrade"

Learn more about the Pro Line Fusion Upgrade

Download Brochure


Duncan Aviation Powers On CJ3 Fusion Flight Deck

»Read More


CJ3 with Rockwell Collins Pro Line Fusion Flight Deck Takes Flight

»Read More


Duncan Aviation Delivers First CJ3 Pro Line Fusion® Flight Deck Upgrade

»Read More